Four coherent scenarios form the basis for the future study. The scenarios combine different rates of economic growth and climate transition, and are based on the WLO scenarios of the Netherlands Environmental Assessment Agency. Each scenario paints a conceivable picture of the future for the year 2125, including consequences for demography, economy, mobility and landscape. Ranging from an “Inno-Parkstad region,” to “Circular Valley,” to “Ribbon City” and “Energy Valley.
The study area covers northern Netherlands and extends along the entire Lelylijn axis, from Amsterdam to Groningen, via Lelystad, Emmeloord, Heerenveen, Drachten and Leeuwarden. In doing so, the Lelylijn is not approached as a stand-alone infrastructure project, but as a meaningful landscape element that connects urbanisation, accessibility, ecology, energy and water management. In words and images, it examines how route, stations and nodes develop in different futures, and what role they play within Daily Urban Systems and alternative forms of accessibility.
The insights provide tools to make strategic and spatial choices that contribute to broad prosperity, spatial quality and a robust development of the northern Netherlands in the long term. Each scenario offers tools to utilise the Lelylijn as an incentive for a sustainable and resilient region.
The foresight is included in the Lelylijn Master Plan.
Year: 2026
Type: vision, design research, infra, climate
Client: Project organisation Lelylijn
I.s.m. Zwarte Hond Groningen
Extent: study area provinces of Flevoland, Friesland, Groningen, Drenthe
Status: research, included in the Lelylijn Master Plan